Testing UM-Client
After installation, it is important to check that UM-Client communicates with the agent:
Tests:
-
For the test purpose, you can
start UM-Client in verbose mode
and analyze the
messages obtained.
-
Another method, when possible, is to generate an event as a mains failure and obtain the following message (after a delay corresponding to « Grace period » parameter value) :
Don't forget to restore UPS main power as soon as you receive this message.
If this message is received, followed by the "UPS utility power restored" message then the protection is operating correctly.