home
***
CD-ROM
|
disk
|
FTP
|
other
***
search
/
Internet Standards
/
CD1.mdf
/
nist
/
oiw
/
agreemnt
/
1993
/
24w_9312.txt
< prev
next >
Wrap
Text File
|
1994-02-09
|
8KB
|
396 lines
Working Implementation
Agreements for Open Systems
Interconnection Protocols:
Part 24 - Conformance Testing
Output from the December 1993 Open Systems Environment
Implementors' Workshop (OIW)
SIG Chair: Eva Kuiper, Hewlett Packard
Workshop Editor: Brenda Gray, NIST
PART 24 - Conformance Testing December 1993 (Working)
Foreword
This part of the Working Implementation Agreements was prepared
by the Conformance Testing Special Interest Group (CTSIG) of the
Open Systems Environment Implementors' Workshop (OIW). See Part
1 - Workshop Policies and Procedures of the "Draft Working
Implementation Agreements Document."
Text in this part has been approved by the Plenary of the above-
mentioned Workshop.
Future changes and additions to this version of these Implementor
Agreements will be published as a new part. Deleted and replaced
text will be shown as struck. New and replacement text will be
shown as shaded.
ii
PART 24 - Conformance Testing December 1993 (Working)
Table of Contents
Part 24 - Conformance Testing . . . . . . . . . . . . . . . . 1
0 Introduction . . . . . . . . . . . . . . . . . . . . . . 1
1 Scope . . . . . . . . . . . . . . . . . . . . . . . . . 1
2 Normative References . . . . . . . . . . . . . . . . . . 1
3 Status . . . . . . . . . . . . . . . . . . . . . . . . . 1
4 Errata . . . . . . . . . . . . . . . . . . . . . . . . . 1
5 Guidelines on Interpretation of Disputed Test Cases . . . 1
5.1 Abstract test cases . . . . . . . . . . . . . . . . 1
5.2 Executable test cases . . . . . . . . . . . . . . . 2
5.3 Static analysis and test case selection . . . . . . 2
6 Guidelines on the Choice of PICS . . . . . . . . . . . . 2
7 CT SIG Resolution for FTAM . . . . . . . . . . . . . . . 2
8 Guidelines for PCTR Test Campaign Summary . . . . . . . 3
9 Resolutions which apply to formal test campaigns . . . . 3
9.1 Testing of collocated MHS '88 elements . . . . . . . 3
9.2 Testing of MHS '88 systems for 1984 conformance . . 3
iii
Part 24 - Conformance Testing
0 Introduction
(Refer to Stable Implementation Agreements Document)
1 Scope
(Refer to Stable Implementation Agreements Document)
2 Normative References
(Refer to Stable Implementation Agreements Document)
3 Status
This material is current as of December 6, 1993.
4 Errata
Errata will be reflected in replacement pages of Version 7,
Stable Document.
5 Guidelines on Interpretation of Disputed Test Cases
5.1 Abstract test cases
The guidelines are given as follows:
a) The Certification/Registration body shall present to the
Conformance SIG the list of disputed test cases prior to the
workshop;
b) If the Conformance SIG is unable to resolve specific
interpretations, the problems shall be discussed with the
relevant protocol SIGs for resolution at the same workshop;
c) If the OIW is unable to resolve an issue, then the OIW
will refer the problem to the relevant standards body. In
such a case the OIW will recommend to all relevant
Certification bodies that the test case be considered as
deselected until it is resolved;
d) In the case where a resolution is reached by the OIW,
the new interpretation shall be distributed to the
1
PART 24 - Conformance Testing December 1993 (Working)
Certification bodies, relevant standards body, MOT
suppliers, and the test case maintenance authority.
5.2 Executable test cases
These problems may be brought before the OIW at the discretion of
a product supplier, test system supplier, test lab, or
Certification Authority. Resolutions will be determined in the
same way as for Abstract Test Case problems.
5.3 Static analysis and test case selection
Disputes regarding static analysis and test case selection will
be handled as above in the case of Abstract Test Cases.
6 Guidelines on the Choice of PICS
SIGs are responsible for referencing the appropriate base
standard PICS proforma for the protocols used by their specific
profiles. The SIGs are also responsible for producing the
International Profile Requirements List(s) for their specific
parts in the Implementors Agreements.
Where an internationally harmonized PICS proforma exists, it
shall be used. In the absence of an available PICS proforma, the
SIGs are encouraged to use the guidelines stated in ISO 9646 to
define a PICS proforma and arrange to have it submitted to the
appropriate standards body. The consequence of not providing for
an internationally harmonized PICS proforma are that implementors
may have to deal with multiple PICS proformas for the same
protocol.
7 CT SIG Resolution for FTAM
The PICS reflects the product. The product being tested is the
protocol machine and the necessary software to fulfill the
functionality indicated in the PICs.
2
PART 24 - Conformance Testing December 1993 (Working)
8 Guidelines for PCTR Test Campaign Summary
Refer to the Stable Agreements Document.
9 Resolutions which apply to formal test campaigns
9.1 Testing of collocated MHS '88 elements
Part 8 of the SIA states that the UA, MS, and MTA configuration
is not restricted; any of these components may be collocated,
although they are depicted as logically separate. In the case of
a collocated UA and MS, a proprietary interface may be used
instead of P7. In the case of a collocated MS and MTA, or a
collocated UA and MTA, a proprietary interface may be used
instead of P3. In the absence of P3 and P7, These components (MS,
UA, and MTA) must be tested and registered together.
9.2 Testing of MHS '88 systems for 1984 conformance
For TCs Rts 1.2.2.3, 51.2.2.3, 55.2.2.1, 56.2.2.1, 56.2.2.2,
56.2.2.3, and 56.2.2.4, since normal mode should be the default
mode, do the following:
a) If implementation is statically configurable, configure
as MHS 84;
b) If implementation is only dynamically configurable:
1) The test cases shall be run, and where possible, a
manual verdict assessment performed in consultation
with JITC;
2) If manual verdict is not possible, a manual verdict
assessment should be performed in consultation with
JITC.
3