home *** CD-ROM | disk | FTP | other *** search
-
- Known problems / bugs / Todo
-
- When first using a datafile from one of the previous versions of Worktime a
- project "11" is initially present. This is due to a data file format change
- and should just be removed the first time.
-
- There are a few places where the screen is not always fully updated.
- Just repaint the screen usng psion-R.
-
- If two entries with the exact same start/meeting time (same day,hour,min,sec)
- are created Worktime has problems locating correctly, usually on top and bottom
- of the screen when scrolling. This is due to the fact that the offset into the
- database is a time stamp. Two entries with the same start time can only be
- produced by copying and pasting an entry in the same spot (or editing the
- records on purpose).
- I am considering changing the insert to do a replace/merge when noticing that
- the entry already exists.
-
- TODO:
-
- Project time cost calculation
- Project cost per hour
- Flags:
- [ Round up/down single (hour/.5/.25) ]
- Round up/down total (hour/.5/.25)
-
-
-