home *** CD-ROM | disk | FTP | other *** search
- #2671
- @001 Enter the name of the OWNER:
- @002 Enter the name of the CONTRACTOR:
- @100 Enter the description of the work to be performed:
- @101 Enter estimated completion schedule:
- !102 Enter the contract price:
- #2672 Do you want to specify materials to be used?
- #if#2672
- @300 Specify areas specified:
- @301 Enter specifications:
- #endif
- #2673 Will the contractor pay for permits?
- #2674 Will contract be required to provide proof of insurance?
- #if#2674
- !103 Enter insurance limits required (in numerals):
- #endif
- #2675/#2676/#2677 Draws will be based on:
- 1/3 Rough in;1/3 inspection;1/6;1/6
- Weekly draw on per centage of completion
- Joint checks on materials; 1/3;1/3- 1/6,1/6 on labor
- #2678 Is contractor required to remove trash?
- #2679
- #end control section
- #2671
- /* Para. 2671: Contract for remodeling, large */
-
-
- CONTRACTING AGREEMENT
-
-
-
- @001, referred to as OWNER, and @002, referred to as CONTRACTOR,
- agree as follows:
-
-
-
- CONTRACTOR shall perform the following services for OWNER:
-
-
- @100
-
-
- on the following estimated schedule:
-
-
-
- @101
-
-
-
- for the following price: $ @102 (!102 dollars)
-
-
-
- Contractor shall be responsible for the following in addition to
- the workman like performance of the work stated above:
-
-
- #2672
- /* Para 2672: Spec of materials */
-
-
- The materials used for the following areas:
-
-
- @300
-
-
- shall meet the following respective specifications, or be
- equivalent to the following manufacturer's product lines
- described:
-
-
- @301
-
-
-
- #2673
- /* Para 2673: Permits */
-
-
- Provision of all permits required for the services to be performed
- above.
-
-
- #2674
- /* Para 2674: Insurance*/
-
-
- Provision of worker's compensation insurance, general liability
- insurance in a minimum amount of $ @103 (!103 dollars).
-
-
- #2675
- /* Para. 2675: Draw sked */
-
-
- The stipulated contract price shall be paid as follows:
-
-
- 1/3 on rough in; 1/3 on first inspection and 1/6 on final
- inspection and 1/6 on final inspection and completion of all
- appearance/punch list in items.
-
-
-
- #2676
- /* Para. 2676: Weekly draw based on per centage of completion*/
-
-
-
- The stipulated contract price shall be paid as follows:
-
-
- A weekly draw based upon per centage of completion, less a
- retainage of 10% per cent, which shall be paid on final
- inspection and completion of appearance/punch list items.
-
-
-
- #2677
- /* Para. 2677: Bills for materials */
-
-
- The stipulated contract price shall be paid as follows:
-
-
- When bona fide bills for materials are presented the same shall
- be paid directly by the OWNER within the terms provided. Labor
- shall be paid as follows:
-
-
- 1/3 on rough in; 1/3 on inspection; 1/6 on completion; 1/6 on
- final inspection and completion of appearance/punch list items.
-
-
- #2678
- /* Para. 2678: Removal of trash */
-
-
- The CONTRACTOR shall daily remove all trash and debris from the
- premises.
-
-
-
- #2679
- /* Para. 2679--- closer */
-
-
- This is the entire agreement between the parties and this
- agreement may only be altered in writing.
-
-
-
-
-
-
- Dated: _________________________
-
-
-
-
-
-
-
-
- ____________________________________________________
-
- @001
-
-
-
-
-
-
-
- ____________________________________________________
-
- @002
-