ocr: Path names. These Must be all entered if you want to use interval saving and script editing, Visual Erks Preferences Scripi Path DHADB/source/Designs/Deno/Scripts Object Path DHEDB/source/Designs/Deno/Ubjects Editor se Project Path DH:DB/source/Designs/Deno/4UI Grid X 20 Grid Y 20 Save Every 15 Minutes Grids values for History OK layout editor (ancel Interval saving Save project iphistory