home *** CD-ROM | disk | FTP | other *** search
/ Hacker Chronicles 1 / HACKER1.ISO / phrk2 / phrack19.5 < prev    next >
Text File  |  1992-09-26  |  11KB  |  242 lines

  1.  
  2.                                ==Phrack Inc.==
  3.                      Volume Two, Issue 19, Phile #5 of 8
  4.  
  5.                     Facility Assignment and Control System
  6.  
  7.                           Written by Phantom Phreaker
  8.  
  9.  
  10. INTRODUCTION
  11. ------------
  12.  
  13.     The Facility Assignment and Control  System (FACS) is an integrated network
  14. component system that most phreaks and hackers know of from an old file
  15. named 'FACS FACTS' written by Sharp Razor. While this file provides an accurate
  16. description of the FAC3~system, it is lacking in detail and length. This file
  17. will provide accurate information about the FACS system and is intended for the
  18. true telecom enthusiast (i.e. this article is not for people who use codes and
  19. call it 'phreaking' or for people who think that phreaking is just 'making free
  20. phone calls'). Hopefully the phreaks and hackers of the world who want to know
  21. how things work in the telephone network will benefit from this information.
  22. Any malicious use of this information is strictly prohibited. The contents of
  23. this file are for informational and educational purposes only.
  24.  
  25.  
  26. GENERAL DESCRIPTION
  27. -------------------
  28.  
  29.     FACS can be described as a full-featured outside plant and central office
  30. facilities assignment system. For the people who are unfamiliar with these
  31. terms, the outside plant is the portion of the telephone network that runs from
  32. a telco office (such as a class five end office (EO)) to the subscriber,
  33. including manholes and distribution/access points such as Serving Area
  34. Interfaces (SAI) which are large, double-door outdoor equipment cabinets which
  35. allow the repair craft to repair, test, and access a multitude of service lines
  36. in that area.
  37.  
  38.     FACS is made up of five component systems, or sub-systems, and some of
  39. these are also used as stand-alone systems (i.e. in an area that does not use
  40. FACS, COSMOS can be thought of as a stand-alone system).
  41.  
  42.     The component systems are:
  43.  
  44. PREMIS - PREmise Information System
  45. SOAC - Service Order Analysis & Control
  46. LFACS - Loop Facility Assignment and Control System
  47. COSMOS - COmputer System for Main Frame OperationS
  48. WM     - Work Manager
  49.  
  50.  
  51.     FACS is used by many departments and work centers in the BOC network. A
  52. geneI1*a5le of telco interaction will be included later in the article.
  53.  
  54.  
  55. PREMIS
  56. ------
  57.  
  58.     PREMIS supports the customer negotiation (i.e. while a customer talks with
  59. a BOC service rep, PREMIS is the computer system the rep has access to) and
  60. service order (SO) preparation process (a SO is basically a request for
  61. service). PREMIS is a computer-based information storage and retrieval system
  62. designed to support the Residence/Residential Service Center (RSC), and in some
  63. cases, the Business Service Center (BSC). The RSC is the center that residence
  64. customers deal with, and the BSC is the center that business customers deal
  65. with.
  66.  
  67.     PREMIS provides fast easy access to customer address verification for
  68. numbered and unnumbered addresses (information is stored by telephone number
  69. not address), telephone service status at an address (whether the phone is in
  70. service, disconnected, pending connect, pending disconnect, disconnected due to
  71. non-payment, etc.), telephone number
  72. assignment for customers (PREMIS can generate a list of available telephone
  73. numbers in a given exchange and the avaiable TNs come from COSMOS) and facility
  74. assignment data for outward orders.
  75.  
  76.     The following PREMIS features are available to the service reps and have
  77. special siginficance to the LAC:
  78.  
  79.  
  80.     Customer Negotiation:
  81.  
  82.         Provides customer service address check against a mechanized Street
  83.         Address Guide (SAG).
  84.  
  85.         Provides customer status check to a mechanized facility address file
  86.         which identifies potential Interfering Station (IS) conditions.
  87.  
  88.         Provides new telephone number assignments through an available TN
  89.        (Telephone Number) file.
  90.  
  91.  
  92.     Service OrdI}reparation:
  93.  
  94.         Provides SAG data.
  95.  
  96.         Provides correct address spelling.
  97.  
  98.  
  99.     PREMIS, as far as I know, does not have any direct dialups so don't get
  100. your hopes up high. There may be other ways to access information in PREMIS
  101. however.
  102.  
  103.  
  104. SOAC
  105. ----
  106.  
  107.     The SOAC system is what interfaces FACS with the BOC SOP (Service Order
  108. Processor). The SOP is what the service reps enter SO information into and the
  109. SOP sends the data entered to the SOAC system. The SOAC system interprets and
  110. validates this input data.
  111.  
  112.     SOAC generates Assignment Requests (ARs) which are sent to LFACS and COSMOS
  113. (see respective sections of this file) to request outside plant (OSP) and CO
  114. facility assignments, respectively.
  115.  
  116.     SOAC recieves AR Responses (ARRs) from LFACS and WM/COSMOS and merges this
  117. data and formats the output into a Universal Service Order (USO) assignment
  118. section. This USO is returned to the SOP after SOAC has processed it.
  119.  
  120.     SOAC returns status information and error notification to the SOP. Status
  121. information is what tells the service rep who entered the data into the SOP
  122. whether or not FACS can process that Service Order. Error notifiers are sent
  123. back to the SOP when part of the SO is
  124. in error.
  125.  
  126.     SOAC keeps record of status and control information on all SO requests, as
  127. well as the input image and specific data that came from processing. This
  128. information, along with the input image and processing results are referred to
  129. as the pending assignment data.
  130.  
  131.     SOs do not automatically flow through SOAC in all cases. SOAC can analyze
  132. an order to determine if manual assistance is required, and if it is, a Request
  133. for Manual Assistance (RMA) notice is sent to the LAC. LAC personnel will
  134. use SOAC, and possibly other systems in FACS, such as COSMOS/WM and LFACS, to
  135. complete the assignment on that SO.
  136.  
  137.     SOAC also may recieve COSMOS system output from certain commands. One such
  138. command may be the IJR command, which sets up a circuit for jeopardy status.
  139. Jeopardy status means that the assignment looks as if it will be (or already
  140. is) behind schedule for completion. An example of this is as follows (showing
  141. COSMOS messages).
  142.  
  143. WC% IJR
  144. H ORD nxxxxxxxx/TN nxx-xxxx/JR nx
  145. RMK NEED TIE PR FOR nxx
  146. -.
  147. **ORDER nxxxxxxxx              HAS BEEN GIVEN JEOPARDY STATUS
  148.   CKTID: TN nxx-xxxx
  149. **JEOPARDY REASON: nx          mm-dd-yy hh:mm
  150. OUTPUT SENT TO SOAC
  151. **IJR COMPLETED   mm-dd-yyy    hh:mm
  152.  
  153.     The H-line input is the SO number, where n can be alphabetic and x can be
  154. numeric. TN is the affected telephone number, JR is the Jeopardy Reason, which
  155. is a one alpha/one numeric code, RMK is a ReMarK, in this case, a tie pair is
  156. needed. The section that starts and ends with two asterisks is the COSMOS
  157. output, and the rest of the information should be self-explanitory.
  158.  
  159.  
  160. LFACS
  161. -----
  162.  
  163.     The LFACS system keeps an inventory of outside loop plant facilities, such
  164. as cables (CA), cable pairs (CP), serving terminals, interconnecting points,
  165. cross-connecting terminals, and things of that nature which should be known to
  166. the serious phreak. By the way, if you want to get some very good information
  167. about the outside loop plant, look for Phucked Agent 04's article in the LOD/H
  168. Technical Journal issue number 1. These are excellent files and I recommend
  169. that every phreak read them if they haven't already. Anyway, LFACS also assigns
  170. the outside loop plant facilities to ARs recieved from SOAC as a result of
  171. customer SO activity. The assignment process is automatic on 95% of the service
  172. requests.
  173.  
  174.     LFACS provides a computerized version of DPAC and ECCR (Dedicated Plant
  175. Assignment Cards and Exchange Cable Conductor Records respectively) which were
  176. previously physical records that were stored at the LAC. The information stored
  177. in DPAC is information such as data about a Living Unit Serving Terminal, and
  178. Living Unit Dedicated Loop Facilities, and ECCR contains information such as
  179. Pair Selection, Add/Break count, Line and Station Transfer, as well as Work
  180. Order (WO) information. Some of this information may be used by the LAC Field
  181. Assistance Bureau to assist the outside plant craft in obtaining necessary
  182. information.
  183.  
  184.     When conditions necessary for LFACSS to automatically respond to a SOAC
  185. AR are not met, a RMA noticed is generated in the LAC. Appropriate people in
  186. the LAC will interact with LFACS, and maybe SOAC and WM/COSMOS to complete the
  187. process of assigment.
  188.  
  189.  
  190. COSMOS
  191. ------
  192.  
  193.     COSMOS has been written about many times, so I will not go into deep detail
  194. about this system as many people are already familiar with it.
  195.  
  196.     COSMOS keeps a database inventory of CO facilities (such as TN, CP, OE, CS,
  197. BL - telephone number, cable pair, office equipment, class of service, bridge
  198. lifter respectively) and assigns these facilities to ARs recieved froom SOAC as
  199. a result of customer SO activity.
  200.  
  201.     COSMOS assists the Network Administration Center (NAC) and Frame Control
  202. Center (FCC) in managing, controlling, and utilizing the MDF and COE, as well
  203. as CO facilities and circuits. COSMOS does assignment of TNs, line equipment,
  204. jumAI*Muse, TP management, frame work management, and other things of
  205. that nature.
  206.  
  207.     When the conditions are not met for COSMOS to respond to a SOAC AR, a RMA
  208. is generated in the LAC (as with the other systems mentioned in this article).
  209. The LAC can then use WM/COSMOS, SOAC, and LFACS to complete assignment.
  210.  
  211.  
  212. WM
  213. --
  214.  
  215.     The WM is what links one set of SOAC/LFACS systems with one or more COSMOS
  216. systems. All input to COSMOS from the LAC is directed through the WM. The WM
  217. provides message switching, load control, and other functions to the LAC.
  218.  
  219. -EOF-
  220.  
  221.  RC:LINE;CHNG!/ORD 1/TN LOD-LOD-LODH/ESM YES/ESX YES/ESL YES/RC:TRK!/TNN $LOD$.
  222.  
  223.     I hope the information presented in this article has been of interest to
  224. all who read it. I have not included as much information as I could have, some
  225. sensitive information has not been included because it could cause problems. My
  226. personal thanks goes out to the fine people who designed the FACS system, as
  227. well as to all the telephone companies in existance, for without you, phone
  228. phreaks would not exist. Thank you for allowing us access to your networks,
  229. although this access is taken rather than given. Try hiring a phreak sometime,
  230. it might be beneficial.
  231.  
  232.     A note to telecom/computer enthusiasts who read this article: DO NOT SCREW
  233. ANYTHING UP! IF YOU ARE NOT RESPONSIBLE ENOUGH TO USE THIS DATA IN A WISE AND
  234. NON-ABUSIVE WAY THEN DISCARD THIS ARTICLE NOW AND PRETEND LIKE YOU NEVER READ
  235. IT.
  236.  
  237.  
  238. This has been a presentation of THE LEGION OF DOOM! (C) 1988+
  239. ===============================================================================
  240. 
  241. Downloaded From P-80 International Information Systems 304-744-2253 12yrs+
  242.