==Phrack Inc.==
Volume Two, Issue 19, Phile #5 of 8
Facility Assignment and Control System
Written by Phantom Phreaker
INTRODUCTION
------------
The Facility Assignment and Control System (FACS) is an integrated network
component system that most phreaks and hackers know of from an old file
named 'FACS FACTS' written by Sharp Razor. While this file provides an accurate
description of the FAC3~system, it is lacking in detail and length. This file
will provide accurate information about the FACS system and is intended for the
true telecom enthusiast (i.e. this article is not for people who use codes and
call it 'phreaking' or for people who think that phreaking is just 'making free
phone calls'). Hopefully the phreaks and hackers of the world who want to know
how things work in the telephone network will benefit from this information.
Any malicious use of this information is strictly prohibited. The contents of
this file are for informational and educational purposes only.
GENERAL DESCRIPTION
-------------------
FACS can be described as a full-featured outside plant and central office
facilities assignment system. For the people who are unfamiliar with these
terms, the outside plant is the portion of the telephone network that runs from
a telco office (such as a class five end office (EO)) to the subscriber,
including manholes and distribution/access points such as Serving Area
Interfaces (SAI) which are large, double-door outdoor equipment cabinets which
allow the repair craft to repair, test, and access a multitude of service lines
in that area.
FACS is made up of five component systems, or sub-systems, and some of
these are also used as stand-alone systems (i.e. in an area that does not use
FACS, COSMOS can be thought of as a stand-alone system).
The component systems are:
PREMIS - PREmise Information System
SOAC - Service Order Analysis & Control
LFACS - Loop Facility Assignment and Control System
COSMOS - COmputer System for Main Frame OperationS
WM - Work Manager
FACS is used by many departments and work centers in the BOC network. A
geneI1*a5le of telco interaction will be included later in the article.
PREMIS
------
PREMIS supports the customer negotiation (i.e. while a customer talks with
a BOC service rep, PREMIS is the computer system the rep has access to) and
service order (SO) preparation process (a SO is basically a request for
service). PREMIS is a computer-based information storage and retrieval system
designed to support the Residence/Residential Service Center (RSC), and in some
cases, the Business Service Center (BSC). The RSC is the center that residence
customers deal with, and the BSC is the center that business customers deal
with.
PREMIS provides fast easy access to customer address verification for
numbered and unnumbered addresses (information is stored by telephone number
not address), telephone service status at an address (whether the phone is in
service, disconnected, pending connect, pending disconnect, disconnected due to
non-payment, etc.), telephone number
assignment for customers (PREMIS can generate a list of available telephone
numbers in a given exchange and the avaiable TNs come from COSMOS) and facility
assignment data for outward orders.
The following PREMIS features are available to the service reps and have
special siginficance to the LAC:
Customer Negotiation:
Provides customer service address check against a mechanized Street
Address Guide (SAG).
Provides customer status check to a mechanized facility address file
which identifies potential Interfering Station (IS) conditions.
Provides new telephone number assignments through an available TN
(Telephone Number) file.
Service OrdI}reparation:
Provides SAG data.
Provides correct address spelling.
PREMIS, as far as I know, does not have any direct dialups so don't get
your hopes up high. There may be other ways to access information in PREMIS
however.
SOAC
----
The SOAC system is what interfaces FACS with the BOC SOP (Service Order
Processor). The SOP is what the service reps enter SO information into and the
SOP sends the data entered to the SOAC system. The SOAC system interprets and
validates this input data.
SOAC generates Assignment Requests (ARs) which are sent to LFACS and COSMOS
(see respective sections of this file) to request outside plant (OSP) and CO
facility assignments, respectively.
SOAC recieves AR Responses (ARRs) from LFACS and WM/COSMOS and merges this
data and formats the output into a Universal Service Order (USO) assignment
section. This USO is returned to the SOP after SOAC has processed it.
SOAC returns status information and error notification to the SOP. Status
information is what tells the service rep who entered the data into the SOP
whether or not FACS can process that Service Order. Error notifiers are sent
back to the SOP when part of the SO is
in error.
SOAC keeps record of status and control information on all SO requests, as
well as the input image and specific data that came from processing. This
information, along with the input image and processing results are referred to
as the pending assignment data.
SOs do not automatically flow through SOAC in all cases. SOAC can analyze
an order to determine if manual assistance is required, and if it is, a Request
for Manual Assistance (RMA) notice is sent to the LAC. LAC personnel will
use SOAC, and possibly other systems in FACS, such as COSMOS/WM and LFACS, to
complete the assignment on that SO.
SOAC also may recieve COSMOS system output from certain commands. One such
command may be the IJR command, which sets up a circuit for jeopardy status.
Jeopardy status means that the assignment looks as if it will be (or already
is) behind schedule for completion. An example of this is as follows (showing
COSMOS messages).
WC% IJR
H ORD nxxxxxxxx/TN nxx-xxxx/JR nx
RMK NEED TIE PR FOR nxx
-.
**ORDER nxxxxxxxx HAS BEEN GIVEN JEOPARDY STATUS
CKTID: TN nxx-xxxx
**JEOPARDY REASON: nx mm-dd-yy hh:mm
OUTPUT SENT TO SOAC
**IJR COMPLETED mm-dd-yyy hh:mm
The H-line input is the SO number, where n can be alphabetic and x can be
numeric. TN is the affected telephone number, JR is the Jeopardy Reason, which
is a one alpha/one numeric code, RMK is a ReMarK, in this case, a tie pair is
needed. The section that starts and ends with two asterisks is the COSMOS
output, and the rest of the information should be self-explanitory.
LFACS
-----
The LFACS system keeps an inventory of outside loop plant facilities, such
as cables (CA), cable pairs (CP), serving terminals, interconnecting points,
cross-connecting terminals, and things of that nature which should be known to
the serious phreak. By the way, if you want to get some very good information
about the outside loop plant, look for Phucked Agent 04's article in the LOD/H
Technical Journal issue number 1. These are excellent files and I recommend
that every phreak read them if they haven't already. Anyway, LFACS also assigns
the outside loop plant facilities to ARs recieved from SOAC as a result of
customer SO activity. The assignment process is automatic on 95% of the service
requests.
LFACS provides a computerized version of DPAC and ECCR (Dedicated Plant
Assignment Cards and Exchange Cable Conductor Records respectively) which were
previously physical records that were stored at the LAC. The information stored
in DPAC is information such as data about a Living Unit Serving Terminal, and
Living Unit Dedicated Loop Facilities, and ECCR contains information such as
Pair Selection, Add/Break count, Line and Station Transfer, as well as Work
Order (WO) information. Some of this information may be used by the LAC Field
Assistance Bureau to assist the outside plant craft in obtaining necessary
information.
When conditions necessary for LFACSS to automatically respond to a SOAC
AR are not met, a RMA noticed is generated in the LAC. Appropriate people in
the LAC will interact with LFACS, and maybe SOAC and WM/COSMOS to complete the
process of assigment.
COSMOS
------
COSMOS has been written about many times, so I will not go into deep detail
about this system as many people are already familiar with it.
COSMOS keeps a database inventory of CO facilities (such as TN, CP, OE, CS,
BL - telephone number, cable pair, office equipment, class of service, bridge
lifter respectively) and assigns these facilities to ARs recieved froom SOAC as
a result of customer SO activity.
COSMOS assists the Network Administration Center (NAC) and Frame Control
Center (FCC) in managing, controlling, and utilizing the MDF and COE, as well
as CO facilities and circuits. COSMOS does assignment of TNs, line equipment,
jumAI*Muse, TP management, frame work management, and other things of
that nature.
When the conditions are not met for COSMOS to respond to a SOAC AR, a RMA
is generated in the LAC (as with the other systems mentioned in this article).
The LAC can then use WM/COSMOS, SOAC, and LFACS to complete assignment.
WM
--
The WM is what links one set of SOAC/LFACS systems with one or more COSMOS
systems. All input to COSMOS from the LAC is directed through the WM. The WM
provides message switching, load control, and other functions to the LAC.
-EOF-
RC:LINE;CHNG!/ORD 1/TN LOD-LOD-LODH/ESM YES/ESX YES/ESL YES/RC:TRK!/TNN $LOD$.
I hope the information presented in this article has been of interest to
all who read it. I have not included as much information as I could have, some
sensitive information has not been included because it could cause problems. My
personal thanks goes out to the fine people who designed the FACS system, as
well as to all the telephone companies in existance, for without you, phone
phreaks would not exist. Thank you for allowing us access to your networks,
although this access is taken rather than given. Try hiring a phreak sometime,
it might be beneficial.
A note to telecom/computer enthusiasts who read this article: DO NOT SCREW
ANYTHING UP! IF YOU ARE NOT RESPONSIBLE ENOUGH TO USE THIS DATA IN A WISE AND
NON-ABUSIVE WAY THEN DISCARD THIS ARTICLE NOW AND PRETEND LIKE YOU NEVER READ
IT.
This has been a presentation of THE LEGION OF DOOM! (C) 1988+
===============================================================================
Downloaded From P-80 International Information Systems 304-744-2253 12yrs+