home *** CD-ROM | disk | FTP | other *** search
/ The New Way Things Work / DKTNWTW.ISO / ARTICLE1 / CRAN / CRAN2Z.DIB (.png) < prev    next >
Bitmap Image  |  1998-09-16  |  42KB  |  496x326  |  8-bit (56 colors)
Labels: text | screenshot
OCR: BUILDING THE CRANE 1 The first section of the crane is fixed fimily to the floor. The climbing frame is lowered onto this and the cab on top of that. > The climbing frame uses a RAISE hydraulic ram to lift the top of the crane. The crane then raises another section of the tower into place. - 3 When the tower crane has TOWER CLIMBING reached the required height SECTION FRAME the climbing fame is removed.