Labels:text OCR: BUILDING THE CRANE 1 The first section of the crane is fixed fimily to the floor. The VE FRAME climbing frame is lowered onto this and the cab on top of that. 2 The climbing frame uses a hydraulic ramt to lift the top of the crane. The crane then CLIMBING raises another section of the FRAME tower into place. - 3 When the tower crane has reached the required height the climbing frame is removed.