home *** CD-ROM | disk | FTP | other *** search
/ The New Way Things Work / DKTNWTW.ISO / ARTICLE1 / CRAN / CRAN3Z.DIB (.png) < prev    next >
Bitmap Image  |  1998-09-16  |  43KB  |  496x326  |  8-bit (56 colors)
Labels: text
OCR: BUILDING THE CRANE 1 The first section of the crane is fixed fimily to the floor. The VE FRAME climbing frame is lowered onto this and the cab on top of that. 2 The climbing frame uses a hydraulic ramt to lift the top of the crane. The crane then CLIMBING raises another section of the FRAME tower into place. - 3 When the tower crane has reached the required height the climbing frame is removed.